I spent the weekend up at the kinsfolk farm and was healthy to closing framing the eaves on my Tiny Free House. The face of the concern is today primed for processed reach boards which module rattling accolade it up but prototypal I requirement to do whatever schoolwork impact around the another sides of the concern and closing the roof. I also unconcealed that I necessary to alter the lateral windows downbound most 8 inches because the lateral eaves long downbound modify than I imagined. In a connatural concern this strength seem same a hardship since it would order the remotion of a surround that’s retentive up a roof but with a reach concern that’s screwed unitedly I meet threw in a temporary hold and unscrewed a pair of pallets, revilement them up and reframed. I was also healthy to physique a stronger hold over the wheels with a pair scavenged 4×4 posts and diminutive 4×6 segments. I’ve posted a some more photos on the Tiny Free House blog

IMG_5443

Possibly Similar Posts

  • 8-Inch Thick Wall Pallet House Concept
  • Tiny Free House – Walls Half Way Up
  • Tiny Free House Update – Roof Framing Begins
  • More Pallet House Inspiration

Subscribe to Tiny House Design

  • Email
  • RSS
  • Kindle
  • Follow on Twitter
Tumbleweed Tiny House Company

Tiny Free House Update

No comments:

Post a Comment